Report on Operational Issues Affecting the Proposed South West-North East Express Metro Scheme - Volume 1 of 2

  • This material is held at
  • Reference
      GB 2856 (NEW)LT000253/006
  • Former Reference
      GB 2856 a/c337/018
  • Dates of Creation
      25 Sep 1996
  • Language of Material
      English
  • Physical Description
      1 folder(s)
  • Location
      TFL000359

Scope and Content

Part 1: Operational feasibility of running a service for a base case option via the Chelsea line; an alternative option via the Battersea branch, and a combined service over a bifurcated route.Part 2: Operational aspects associated with infrastructure such as signalling, rolling stock and emergency escape/access philosophy.

Access Information

Closed

26/09/2016

Closed for standard 20 years