South West-North East Metro Chelsea-Hackney Line Base Assumptions report

  • This material is held at
  • Reference
      GB 2856 (NEW)LT000253/077
  • Former Reference
      GB 2856 a/c337/021 LT000253/058
  • Dates of Creation
      3 Oct 1994
  • Language of Material
      English
  • Physical Description
      1 folder(s)
  • Location
      TFL000371

Scope and Content

This study states the parameters and assumptions on which the 'optimised designs' for the South West-North East Metro are based.

Access Information

Closed

04/10/2014

Closed for standard 20 years