Construction works on north side of King's Dock: a. Additional piles and beams. No 1 and No 2 tips, 16 Oct 1909, Scale 2 ft to 1 inch; b. 14 inch x 14 inch pile, No 1 and No 2 tips, 16 Oct 1909, No scale; c. Extra beams under fixed hoist, 18 Apr 1910, Scale 2 ft to 1 inch; d. Tip No 5 piles, 8 Dec 1909, Scales 8 ft, 2 ft to 1 inch; e. Piles as (d), 15 March 1910; f. Tip No 5 struts and bracings, 9 Apr 1910; g. Tip No 5 columns, 9 Mar 1910; h. Tip No 3 Piles, columns, struts; i. Tip No 3 Decking; j. Tip No 5 Tie beams, struts; k. Tip No 4 Piles, columns, struts etc; l. Turntable, tips Nos. 2, 3, 4, 9 Dec 1909; m. Tip No 4, decking, 7 July 1910; n. Turntable foundations, tips Nos. 2, 3,4; o. Turntable, No 1 Tip, 14 Dec 1909; p. Tip No 5, decking modifications to beams 63, 64, 65, 22 April 1910; q. Tip No 5 decking, 22 Apr 1910; r. Details Tip No 4? (plan torn), 10 March 1910; s. Details Tip No 4, ?27 Apr 1910; t. Weighbridge Tip No 3, 11/14 May 1910; u. Weighbridge Tip No 3, 19 May 1910; v. Rhondda and Swansea Bay Railway: retaining wall and main wall B, sections, 21 Sept 1912; w. Retaining wall, elevation and plan, 20 Sept 1912; x. Retaining wall, sections and main wall C, details, 23 Sept 1912; y. Retaining wall, details wall A, plan and elevation, 24 Sept 1912. All by L. G. Monchel & Partners, civil engineers. 1909-1912

  • This material is held at
  • Reference
      GB 216 D/D SHa/1/12
  • Dates of Creation
      1909-1912
  • Language of Material
      English
  • Physical Description
      25 plans