London Transport: Railway Management Meeting Number 18 held 10 November 1981

  • This material is held at
  • Reference
      GB 2856 (NEW)LT000442/018
  • Former Reference
      GB 2856 A0436/007 A0436/018
  • Dates of Creation
      9 Jun 1981-10 Nov 1981
  • Language of Material
      English
  • Physical Description
      1 folder(s)
  • Location
      TFL013507

Scope and Content

Agenda, minutes (two copies) and papers.Subjects include:402/11/81 - Previous minutes (two copies).403/11/81 - Outstanding items - railway business.404/11/81 - Office Allocation and Strategy Panel (ASP).405/11/81 - Survey of booking office queues - RM(81)356.406/11/81 - A review of the April suburban bus flat fare scheme - RM(81)352.407/11/81 - Productivity indicator project: interim report - RM(81)367.408/11/81 - Proposed authorisation of major railway works - RM(81)365.409/11/81 - D78 stock ventilation system: position at 3 November 1981 - RM(81)360.410/11/81 - 1983 tube stock progress report - RM(81)361.411/11/81 - Progress report on project management - RM(81)362.412/11/81 - Department of Transport planning (DTp)/London Transport Executive research and development programme - RM(81)359.413/11/81 - Heathrow Central Station: fire precautions - RM(81)368.414/11/81 - Heathrow Terminal 4: safeguarding of station box for Piccadilly Line 'Loop' scheme - RM(81)364.415/11/81 - Fully Automatic Control of Trains: appraisal of costs and benefits - RM(81)329.416/11/81 - Fully Automatic Control of Trains (FACT) - stage 2 - RM(81)327.417/11/81 - Introduction of new track form - RM(81)350.418/11/81 - Manufacture of replacement escalator chain at Acton Works - RM(81)354.419/11/81 - Railway operations and mechanical engineering plant and machinery - 1982 programme - RM(81)353.420/11/81 - Civil engineering planning and design 1982/1983 - RM(81)351.421/11/81 - Modernisation of main stores, Acton phase I - RM(81)355.422/11/81 - Metropolitan, Circle, Victoria and Northern Lines - Euston/King's Cross - British Library - Euston - RM(81)349.423/11/81 - SER 250/884 - Provision of closed circuit television (CCTV) and centralised control of public address equipment at six Central Area stations (second group) - supplementary authority - RM(81)347.424/11/81 - SER 300/792 - Greenwich Generating Station - demolition of Pier - life extension - RM(81)346.425/11/81 - Station Modernisation Committee.426/11/81 - Railway Engineering meeting.427/11/81 - Departmental meetings.

Access Information

Open