Power Houses: General Correspondence

  • This material is held at
  • Reference
      GB 2856 (NEW)LT000487/003
  • Former Reference
      GB 2856 A0252/009 Part2/1/Series1/116 LT000231/116
  • Dates of Creation
      3 Feb 1941-31 Dec 1947
  • Language of Material
      English
  • Physical Description
      1 folder(s)
  • Location
      TFL003018

Scope and Content

Reports and memoranda including details of wartime arrangements, coal consumption, a fatal accident at Lewisham tramway substation, repairs to power stations, the conversion of boilers at the London Passenger Transport Board's (LPTB) Neasden generating station to oil firing, the use of high tension cables, alternative supplies of traction current, note on the electricity supply in South London and a standby supply of power for the LPTB's lines as well as the use of dust-extractor units.

Access Information

Open