Photographic collection: View looking eastwards along empty South Dock showing new cut bridge operational and Pump House on left with scaffolding. Note Dock wall in process of being repaired

  • This material is held at
  • Reference
      GB 216 P/PR/105/8/89
  • Dates of Creation
      1981
  • Language of Material
      English
  • Physical Description
      1 photograph, in colour